Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
item
- Title
- Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
- Description
- LCN 10170353LCN 17294973
- Photographs were taken by Fred Helie, a worker on the project sometime between 1950 - 1958
- en-CA Pipe above surface is the top part of the continuous steel duct extending to the tunnel below. Directly to the right of the duct is the fan and motor partly covered by tarpaulin
- Identifier
- http://www.nflibrary.ca/nfplindex/show.asp?b=1&ref=oo&id=89964
- Creator
- Helie, Fred
- Medium
- Photograph
- Extent
- 5" x 4" black & white photograph from album My Three and One Half Years Underground by Fred Helie
- Provenance
- Donated by Fred Helie
- Date
- 1953
- Is Part Of
- Fred Helie Collection
- locator
- LHC FH Collection
- Rights Holder
- Niagara Falls Public Library
- Rights
- Fred Helie
- Subject
- Hydro Electric Power - Tunnels - Construction
- Power Plants - Sir Adam Beck 2
- Spatial Coverage
- Canada - Ontario - Queenston
- number
- D10839
- Format
- Photograph