Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
item
- Title
- Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
- Description
- LCN 10170353LCN 17294973
- Photographs were taken by Fred Helie, a worker on the project sometime between 1950 - 1958
- en-CA ...forming of girders for concreting into same place. Traffic from no.1 and no.2 tunnel will travel on the floor laid on these girders. The rock bolts you see jutting out of the rocks will serve to secure the re-inforcing steel in the concrete ring, until ready to pour. Note that the section whre a 12x12 timber holds the loose rock above, is actually the start of the crosscut section
- Identifier
- http://www.nflibrary.ca/nfplindex/show.asp?b=1&ref=oo&id=89916
- Creator
- Helie, Fred
- Medium
- Photograph
- Extent
- 5" x 4" black & white photograph from album My Three and One Half Years Underground by Fred Helie
- Provenance
- Donated by Fred Helie
- Date
- 1953
- Is Part Of
- Fred Helie Collection
- locator
- LHC FH Collection
- Rights Holder
- Niagara Falls Public Library
- Rights
- Fred Helie
- Subject
- Hydro Electric Power - Tunnels - Construction
- Power Plants - Sir Adam Beck 2
- Spatial Coverage
- Canada - Ontario - Queenston
- number