Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
item
- Title
- Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
- Description
- LCN 10170353 WELL DRILLINGLCN 17294973
- Photographs were taken by Fred Helie, a worker on the project sometime between 1950 - 1958
- en-CA Well-drillers at work. An 18 inch hole was bored through the surface straight down to the tunnel below, averaging from 290 ft to 350 ft in depth, depending on the location. These holes were bored at 400 ft. intervals, following the contour of the tunnel below. A 10" steel pipe was then inserted for the full length of the hole. This pipe in turn was used to drop the concrete to a hopper in the tunnel which in turn transferred it to the pumpcrete machines
- Identifier
- http://www.nflibrary.ca/nfplindex/show.asp?b=1&ref=oo&id=89816
- Creator
- Helie, Fred
- Medium
- Photograph
- Extent
- 5" x 4" black & white photograph from album My Three and One Half Years Underground by Fred Helie
- Provenance
- Donated by Fred Helie
- Date
- 1953
- Is Part Of
- Fred Helie Collection
- locator
- LHC FH Collection
- Rights Holder
- Niagara Falls Public Library
- Rights
- Fred Helie
- Subject
- Hydro Electric Power - Tunnels - Construction
- Power Plants - Sir Adam Beck 2
- Spatial Coverage
- Canada - Ontario - Queenston
- number
- D10686
- Format
- Photograph
- Date Created
- 2002-12-13
- Date Modified
- 2005-01-20