Official opening of the Queenston-Chippawa Power development on the twenty-eighth day...

item
Title
Official opening of the Queenston-Chippawa Power development on the twenty-eighth day...
Description
LCN 10160805 ADAM BECK
Sepia toned scan from book Official opening of the Queenston-Chippawa Power development on the twenty-eighth day of December MCMXXI by the Hydro-Electric Commission of Ontario
en-CA Illustration titled Fig.9 Placing concrete lining on rock sides of canal. Completed sections 40 feet in length in foreground with mixing plant and forms in distance
Identifier
http://www.nflibrary.ca/nfplindex/show.asp?b=1&ref=oo&id=90087
Medium
Scan from book
Date
1921
Is Part Of
Niagara Falls Public Library Local History Collection
locator
LHC 621.31059 Oakes Room
Rights Holder
Public Domain
Rights
Hydro-Electric Power Commission of Ontario
Subject
Hydro Electric Power - Tunnels - Queenston-Chippawa Canal
Spatial Coverage
Canada - Ontario
number
D10953
Format
Scan from book
Date Created
2003-01-09
Date Modified
2005-05-06
Item sets
Historical Images Item Set
Niagara Falls Public Library Local History Collection
Media
Official opening of the Queenston Chippawa Power development on the twenty eighth day