Official opening of the Queenston-Chippawa Power development on the twenty-eighth day...
item
- Title
- Official opening of the Queenston-Chippawa Power development on the twenty-eighth day...
- Description
- LCN 10160805 ADAM BECK
- Sepia toned scan from book Official opening of the Queenston-Chippawa Power development on the twenty-eighth day of December MCMXXI by the Hydro-Electric Commission of Ontario
- en-CA Illustration titled Fig. 6 Looking up a portion of the canal, with concrete lining completed. Note group of men in distance
- Identifier
- http://www.nflibrary.ca/nfplindex/show.asp?b=1&ref=oo&id=90084
- Medium
- Scan from book
- Date
- 1921
- Is Part Of
- Niagara Falls Public Library Local History Collection
- locator
- LHC 621.31059 Oakes Room
- Rights Holder
- Public Domain
- Rights
- Hydro-Electric Power Commission of Ontario
- Subject
- Hydro Electric Power - Tunnels - Queenston-Chippawa Canal
- Spatial Coverage
- Canada - Ontario
- number
- D10950
- Format
- Scan from book
- Date Created
- 2003-01-09
- Date Modified
- 2005-01-20