Official opening of the Queenston-Chippawa Power development on the twenty-eighth day...

item
Title
Official opening of the Queenston-Chippawa Power development on the twenty-eighth day...
Description
LCN 10160805 ADAM BECK
Sepia toned scan from book Official opening of the Queenston-Chippawa Power development on the twenty-eighth day of December MCMXXI by the Hydro-Electric Commission of Ontario
en-CA Illustration titled Fig.2 Bird's eye view showing intake from Niagara River above the Falls with Welland River section in foreground leading water to Control Works at upper end of canal which stretches to Power House at Queenston where water is returned to the lower Niagara River
Identifier
http://www.nflibrary.ca/nfplindex/show.asp?b=1&ref=oo&id=90080
Medium
Scan from book
Date
1921
Is Part Of
Niagara Falls Public Library Local History Collection
locator
LHC 621.31059 Oakes Room
Rights Holder
Public Domain
Rights
Hydro-Electric Power Commission of Ontario
Subject
Hydro Electric Power - Tunnels - Queenston-Chippawa Canal
Spatial Coverage
Canada - Ontario
number
D10946
Format
Scan from book
Date Created
2003-01-09
Date Modified
2005-01-20
Item sets
Historical Images Item Set
Niagara Falls Public Library Local History Collection
Media
Official opening of the Queenston Chippawa Power development on the twenty eighth day