Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2

item
Title
Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
Description
LCN 10170353LCN 17294973
Photographs were taken by Fred Helie, a worker on the project sometime between 1950 - 1958
en-CA At the beginning of operations it was thought advisable to drill and blast the full face of the tunnel at the same time. The reason for the lower drilling jumbo. This operation proved unwise, and we then proceeded to first remove the top section of the tunnel, then came back all the way and drilled the bottom section from the top of the rock rather than the face
Identifier
http://www.nflibrary.ca/nfplindex/show.asp?b=1&ref=oo&id=89838
Creator
Helie, Fred
Medium
Photograph
Extent
5" x 4" black & white photograph from album My Three and One Half Years Underground by Fred Helie
Provenance
Donated by Fred Helie
Date
1953
Is Part Of
Fred Helie Collection
locator
LHC FH Collection
Rights Holder
Niagara Falls Public Library
Rights
Fred Helie
Subject
Hydro Electric Power - Tunnels - Construction
Power Plants - Sir Adam Beck 2
Spatial Coverage
Canada - Ontario - Queenston
number
D10708
Format
Photograph
Date Created
2002-12-14
Date Modified
2005-01-20
Item sets
Historical Images Item Set
Fred Helie Collection
Media
Construction of Ontario Hydro tunnels for the Sir Adam Beck Niagara Generating Station 2