Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
item
- Title
- Construction of Ontario Hydro tunnels for the Sir Adam Beck - Niagara Generating Station #2
- Description
- LCN 10170353LCN 17294973
- Photographs were taken by Fred Helie, a worker on the project sometime between 1950 - 1958
- en-CA At the beginning of operations it was thought advisable to drill and blast the full face of the tunnel at the same time. The reason for the lower drilling jumbo. This operation proved unwise, and we then proceeded to first remove the top section of the tunnel, then came back all the way and drilled the bottom section from the top of the rock rather than the face
- Identifier
- http://www.nflibrary.ca/nfplindex/show.asp?b=1&ref=oo&id=89838
- Creator
- Helie, Fred
- Medium
- Photograph
- Extent
- 5" x 4" black & white photograph from album My Three and One Half Years Underground by Fred Helie
- Provenance
- Donated by Fred Helie
- Date
- 1953
- Is Part Of
- Fred Helie Collection
- locator
- LHC FH Collection
- Rights Holder
- Niagara Falls Public Library
- Rights
- Fred Helie
- Subject
- Hydro Electric Power - Tunnels - Construction
- Power Plants - Sir Adam Beck 2
- Spatial Coverage
- Canada - Ontario - Queenston
- number
- D10708
- Format
- Photograph
- Date Created
- 2002-12-14
- Date Modified
- 2005-01-20